The framing progress was well documented on the preceding page. The first few images on this page show the interior with the insulation installed. We elected to insulate every interior wall in the house while we had the opportunity. While that isn’t standard procedure, it is helpful for sound control and should make a difference in heat management as well.

The electrical panel in the basement before the panel was trimmed out. The panel seen in the photo filled up quickly so a second panel was added.



_DKM0438

The main floor after the insulation was added. The window on the South wall (the one on the right) is new. It replaced a smaller window in the same location. ↓


_DKM0451


The new sliding glass door on the main floor. It replaced a similar door which is now installed in the basement. The door was an upgrade that will look much better than the door it replaced. We replaced over half the windows in the house in addition to adding several new ones. The new windows were an expensive upgrade but well worth it when you consider the impact on the whole project. The brand of windows? Marvin of course.


_DKM0439


The insulated master bedroom. A much anticipated upgrade is the new 8’ x 8’ sliding glass door. It replaced a standard door which was in pretty rough shape. We knew something had to be done with the door so we thought, what the heck, why not do the whole house while we’re at it. On the floor you’ll see carpet samples Heidi is using to select the floor covering. ↓

_DKM0442


The master bath.


_DKM0444


The East guest bedroom with a carpet sample on the floor.


_DKM0447


The sheetrock stocked in the master bedroom. ↓

IMG_0457


The “mud” for the project. ↓


IMG_0452


ROCK ON! It’s done; the sheetrock crew finished their portion of the job Saturday afternoon (1/24). Below are photos shot Sunday night. The first image is the main floor facing South. The large pile of wood seen in the left-center of the photo is the hardwood which has been inside acclimating since 1/21. The hardwood installation begins on 1/28. ↓


_DKM0454


Main floor powder room and library niche. I know, I know, many of you thought the powder room and library niche were one-in-the-same. NOT.↓

_DKM0455


Bedroom Hall ↓

_DKM0458


East guest bedroom ↓

_DKM0459


Walk-in closet in East guest bedroom ↓

_DKM0460


West guest bedroom walk-in closet and TV niche ↓

_DKM0461

Guest bathroom ↓

_DKM0462


Master bedroom ↓

_DKM0463


Master bath ↓

_DKM0465


Basement ↓


_DKM0468


This image shows the West and South sides of the house. The two largest windows in the picture were existing windows that received the new trim. All other windows are new ↓


_DKM0476


The East (water) side of the house showing existing windows with new trim ↓

_DKM0472


Heidi, busy in the “kitchen” ↓

_DKM0478


A lot has happened in the last few days however, most of the work isn’t quite ready for the website. Steve - the painter - has painted a coat of primer on all the walls and is currently focusing his attention on the millwork. Dale has been busy installing the moulding, casings and doors which Steve will finish once they’re in place. Everything is looking great especially the new hardwood floor which has received its first coat of finish. We chose a product called “Tigerwood” which we saw at the Home Show two years ago. A photograph can’t begin to convey the real beauty of this floor but, it’s not bad.


_DKM0494




Click here to continue